LogFAQs > #905533624

LurkerFAQs, Active DB, DB1, DB2, Database 3 ( 02.21.2018-07.23.2018 ), DB4, DB5, DB6, DB7, DB8, DB9, DB10, DB11, DB12, Clear
Topic List
Page List: 1
TopicNew Study found Four-Day a week work week was a, "resounding success."
Perascamin
07/22/18 4:13:23 PM
#39:


I used to work 4 10s, but I hated it because the walk to get to your work spot was 13 minutes from parking lot to spot in factory, and that was fast walking. Drive was 15 minutes.

I was spending about 13 minutes to clock in, 18 minutes to get gathered up and leave. (Wash hands, take a piss, wash hands again, get stuff gathered, walk to car). Took me about 5 minutes to make lunch at home and pack it, then about 30 minutes to shower, eat dinner, and then be ready to wind down.

I was spending about 1hr 30 mins on time getting to/leaving/preparing/ winding down from work. So really, by the time it was said and done, the work day was taking up almost 12 1/2 hours of the day, and the shift I worked was something stipid like 2pm-12am. So when you were done with work, there was just no way to do anything else that dat and that was incredibly frustrating
---
I've grown.
... Copied to Clipboard!
Topic List
Page List: 1